SeleznevDmitry Seleznev

Deputy Technical Director

Dmitry Seleznev has been working for OOO COTES Engineering since 2017, being responsible for proper implementation of all projects of the company in terms of engineering. His experience, professionalism and high qualification allow high-quality performance of sophisticated works on the short-term basis.

Dmitry Seleznev has been working in the power generation industry over 40 years. His career started in 1978 in the Energoset Proyekt Institute at the position of Substations Department Engineer. In 1979-1993 he worked for OAO Sibtekhenergo, where he was promoted from an engineer to the Distributed Control System Department Brigade Engineer. Dmitry Seleznev took a personal part in implementation of the automatic water chemistry monitoring system (which is one of the USSR first water chemistry monitoring systems) for 200 MW unit at Belovskaya GRES. He participated in development of codes and standards by the Ministry of Energetics of the USSR. In 1984 to 1993 he headed the team for commissioning of automatic control gear systems for 200 MW double units (forming part of two Е-500 boilers and Т-180 turbine) at Novo-Irkutskaya CHP plant's 2nd stage.

In 1993 he worked as a foreman for Novosibirskaya CHP-5 plant belonging to OAO Novosibirskenergo, and later he was promoted to the chief foreman for repairs of boiler and machinery hall and fuel feeding automatics. In 1995 to 1997 Dmitry Seleznev gained an experience by working as the Head of Technical Engineering Department and Heat Supply Services in Buzuluk, Orenburg Region. In 1997 he headed Heat and Water Supply Unit at FGUP Novosibirsk Precious Metals Refinery. In 1997 to 1998 he occupied position of the State Inspector for national water resources protection in Novosibirsk. In 1998 to 2003 he was Inspector and then promoted to the Head of Heat Supply Inspectorate of the Novosibirsk Gosenergonadzor (State Power Supply Inspectorate) territorial administration.

For 10 years, from 2003 to 2013 Dmitry Seleznev worked for ZAO SibCOTES at positions of Chief Specialist, Head of the Process Control Automation Department and Director for Pre-commissioning and Automation Department. In 2013 to 2017 he worked for OOO Intertekhenergo as the Commissioning Director. He was fully engaged in turn-key projects for distributed control systems implementation at Novosibirskaya CHP-5 plant's 200 MW units, at Krasnodarskaya CHP plant's CCPP-450 unit, at Krasnoyarskaya CHP-3 plant's 200 MW unit and at Nyaganskaya GRES' CCPP-420 unit. His responsibilities covered pre-commissioning of thermal mechanical equipment, electrics and distributed control system at the Siberian Chemical Plant's CHP plant (Seversk), at Fria CHP plant (Guinea), at Krasnoyarskaya CHP-3 plant's 200 MW unit, at Belovskaya GRES' 200 MW unit, at Berezovskaya GRES 800 MW unit's 2650 t/h boiler.

Dmitry Seleznev graduated from the Electrotechnical Faculty of the Novosibirsk State Technical University (electrotechnical engineer).